Best WPP9IQT42SB Manuel d'installation Page 9

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 72
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 8
- 9 -
IN-LINE BLOWER
FIG. 5
INSTALL THE DUCTWORK
(WPP9IQ and WPP9IQT)
NOTE: To reduce the risk of fire, use only
metal ductwork.
1. Decide where the ductwork will run
between the hood and the outside.
2. A straight, short duct run will allow the hood
to perform most efficiently.
It is recommended that there be a minimum
of 6” of straight duct from to an elbow for 8”
duct and 12” for 10” duct.
3. Long duct runs, elbows, and transitions will
reduce the performance of the hood. Use
as few of them as possible.
4. Install a roof or wall cap. Connect 8" WPPIQ
(or 10” WPPIQT) round metal ductwork to
cap and work back towards hood location.
Use duct tape to seal the joints between
ductwork sections (Fig.6).
24” TO 36” ABOVE
COOKING SURFACE
ROOF CAP
WALL
CAP
8” OR 10” ROUND
ELBOW
HOOD
DECORATIVE
FLUE
8” OR 10” ROUND
DUCT
FIG.6
8” DUCT (5 - 1/8”)
10” DUCT (5 - 3/8”)
CENTERLINE OF
DUCT TO WALL
Vue de la page 8
1 2 3 4 5 6 7 8 9 10 11 12 13 14 ... 71 72

Commentaires sur ces manuels

Pas de commentaire