INSTALL THE DUCTWORK
(DUCTED HOODS ONLY)
NOTE: To reduce the risk of fire, use only
metal ductwork.
1. Decide where the ductwork will run between
the hood and the outside.
2. A straight, short duct run will allow the hood
to perform most efficiently.
3. Long duct runs, elbows, and transitions will
reduce the performance of the hood. Use as
few of them as possible. Larger ducting may
be required for best performance with longer
duct runs.
4. Install a roof or wall cap. Connect round metal
ductwork to cap and work back towards hood
location. Use duct tape to seal the joints
between ductwork sections.
INSTALL THE DUCTWORK
(NON-DUCTED HOODS ONLY)
NOTE: The following material must be
purchased separately for non-ducted
recirculation installations.
• Non-ducted Recirculation Kit Model ANKU10
(contains 8" to 6" reducer and two charcoal
filters).
• 6" round metal ductwork and fittings.
1. Remove and discard the aluminum damper
flaps from the 8" duct connector.
2. Attach the 8" to 6" reducer to the 8" duct
connector.
3. Attach 6" round metal ductwork and fittings.
4. Run ductwork to the location where it is
discharged back into the room.
5. Duct tape all joints to make them secure and
air tight.